Farm Building Concrete Floors

Ag floors sized for real equipment loads, sloped to drain, poured on ground that's been compacted like it matters.

Get a Free Estimate
Large fresh concrete floor inside a steel-frame pole barn machine shed
Founded 2019Owner on every pourOwn crew, never subsSilver Creek, Nebraska

Straight talk

Farm Building Floors: what you should know first

A house driveway carries a pickup. A machine shed floor carries a combine, a loaded grain cart, and a tractor with duals — sometimes all in the same season. Farm concrete is a different load class, and it needs to be built like it.

We grew up around this work. When Jerry walks a shed site, the questions are practical: what's the heaviest thing that'll sit on this floor, where will it sit, and where does water need to go? The answers set the thickness, the steel, and the slope — before anyone talks price.

Full transparency

How J Gehring builds it

Thickness set by the load

Five inches is our floor, not our ceiling. High-load zones — where equipment parks or grain carts stage — get thicker sections.

Compaction that matches the tonnage

Equipment loads punish soft spots. The subgrade gets deep compaction, and we'll tell you if your site needs base material brought in.

Slope and drainage planned first

Wash water, snowmelt off equipment, the occasional leak — an ag floor needs a plan for water. We set the fall in the forms.

Rebar throughout, joints on time

Steel in every pour and saw cuts on schedule, spaced for big panels.

Good fit

What it's good for

  • Machine shed and pole barn floors
  • Farm shop floors
  • Grain bin pads and aprons
  • Equipment yards and approaches

Honest pricing

What sets the price

  • → Square footage — ag floors are usually well past the 200 sq ft minimum
  • → Thickness by load zone
  • → Base material and compaction the site needs
  • → Drainage details and floor drains
  • → Distance and truck access for large pours

No number over the phone — Jerry walks your ground first, then the quote comes written and itemized.

Step by step

How the job runs

  1. 1

    On-site estimate

    Jerry walks your ground himself and gives you an honest read of what it needs — including whether your project should wait a season.

  2. 2

    Written itemized quote + locked start date

    You see exactly what you're paying for, and you get a start date in writing before work begins.

  3. 3

    Pre-construction meeting

    Before a tool comes out, we walk the plan together — layout, grades, access, and what to expect each day.

  4. 4

    Base day: excavate + deep compaction

    We spend the first day on the base. Deep subgrade compaction happens before any concrete is ordered.

  5. 5

    Form, rebar, pour at 5"+

    Forms set to grade, rebar in every pour — not an upcharge — and a minimum of five inches of concrete.

  6. 6

    Joints cut on schedule + finish

    Control joints get cut before the slab picks its own crack line, not days late. Then the finish you chose.

  7. 7

    Final walk-around with you

    Before the crew leaves, you and Jerry walk the whole job together. Questions answered on the spot.

Common questions

Farm Building Floors FAQ

No pressure, no runaround

Start with a free on-site estimate

Jerry comes out, walks your ground, and gives you an honest read of what it needs — including whether your project should wait a season. Then you get a written, itemized quote with a locked start date. That's it.

  • → Owner on site for every pour
  • → Rebar in every pour, five inches minimum
  • → Start date in writing before work begins